Avenor Gatineau
Construction
of a control building for the pumping station with pump bases,
basin, and chemical reservoir.
- Settling tank construction: Circular concrete basin
measuring 56 m in diameter and 6 m high with integral
gutters.
- Layout of installations for processing waste sludgein
a section of the deinking plant.
- Construction of installations to capture wastewater from
the old treatment plant.
Construction of an emergency basin whose bottom was
located lower than the level of the nearby Gatineau River.
- Construction of a concrete basin measuring 210 m x 150
m x 5 m in depth, with concrete inflow and outflow spillways
for draining.
- Excavation and application of membrane.
- Construction of an access ramp to the basin.
- Renovation of the existing settling basin.
- Installation of a Panshall canal to calculate wastewater
flow.